Written in the contract.
Commercial fit-outs and office renovations across the UAE — shell and core to mid-luxury finish at 250 AED/sqft, with a contractual penalty clause if we miss your handover date.
Every project manager on your side has heard 'just a few more days.' We heard it too, fifteen years ago — and wrote Clause 7.2 to end that conversation permanently. One in-house team. One signature. One deadline.
ROUND TRIANGLE FOUNDER · JOINERY WORKSHOP
Round Triangle Decoration Co. L.L.C. is a licensed UAE general contractor with an in-house design team, an in-house joinery workshop, and full MEP capability under a single trade license. We handle municipality submissions, Trakheesi, DM, and free-zone permits ourselves — not through a third party who charges you twice and blames the authority when it slips.
"We built this company around one rule: if we say a date, that date is in the contract and money is behind it. Every trade, every approval, every material — in-house. No excuses from third parties. Just a date and a signature."
— Founder, Round Triangle Decoration Co. L.L.C.
We take shell-and-core commercial spaces and deliver fully fitted, permit-approved offices. Design, joinery, MEP, flooring, partitions, AC — every trade in-house, one project manager, one contract. Spaces from 500 sqft to multi-floor developments, from 250 AED/sqft mid-luxury entry point.
Get a Scope & Cost Estimate
In-house designer produces concept, drawings, and material specs — no separate design agency, no handoff friction.
Reception desks, wall panels, storage, and fitted furniture built in our own workshop, not sourced from catalogue.
Full office demising systems — frameless, framed, fire-rated, and acoustic-rated, fabricated and installed by our team.
Every commercial flooring type installed and warranted in-house. Material selection supported by our designer.
Full electrical wiring, central AC systems, split units, and duct cleaning — scoped, installed, and approved internally.
Site handed over clean, documented, and ready for occupancy — not left to the client to arrange separately.
Every service above is delivered by our permanent in-house team. Zero subcontractors means zero finger-pointing when a deadline is tight.
WhatsApp Us Your SqftEvery UAE contractor promises on-time delivery. We are the only one who pays you when we miss it. Clause 7.2 has been in every Round Triangle contract since 2010. It is not a marketing claim. It is a financial obligation we have honoured — and never triggered — across 15 years of UAE projects.
Why does this matter to you? Because the real cost of a six-week delay is not the inconvenience. It is the rent you pay on a space you cannot use, the staff disruption, the client meetings cancelled, and the launch date that moves. Clause 7.2 makes us feel that cost instead of you.
Ask us to show you the clause before you sign anything.
See the Contract Clause on WhatsApp"In the event that Round Triangle Decoration Co. L.L.C. fails to achieve practical completion by the contractually agreed handover date, the contractor shall pay the client a daily penalty for each calendar day of delay, as specified in the signed contract schedule. This obligation is not subject to force-majeure carve-outs for contractor-caused delays."
Paraphrased from our standard contract. Full language provided at quotation stage.
No separate design agency. No approval consultant. No subcontractors. Every step below is handled by the same in-house team, which is why we can put a date on step six and mean it.
We visit, measure, and return a written scope within 48 hours — no vague estimates.
In-house designer produces concept drawings, material specs, and 3D visuals — approved before a single AED is committed.
Line-itemised cost at 250 AED/sqft entry point, with Clause 7.2 penalty schedule written into the document you sign.
Municipality, Trakheesi, DM, and free-zone submissions handled in-house — the most common delay in UAE fit-outs, removed from your list.
Joinery, MEP, partitions, flooring, AC, painting — our permanent team on site, with daily progress tracked against your contract date.
Practical completion certificate, post-construction clean, and snag list closed before keys change hands. On the date we wrote in step three.
These are real projects with real sqft, real timelines, and real handover dates. We document every stage — not for Instagram, but because a client who can read a progress report is a client who trusts the contractor.
Handed over 3 days early. Penalty clause never triggered.
Client operational on planned launch date.
On-time. Zero variation orders. Single point of contact throughout.
All photography shows Round Triangle projects. Sqft, duration, and district overlaid on every image.
Request Full Portfolio on WhatsAppMost contractors give you a number. We give you a breakdown before you sign — every material, every trade, every approval fee shown in the contract. No surprises at handover.
Ideal for: new commercial leases, blank-shell offices, SME fit-outs
Ideal for: corporate offices, clinics, financial services, retail
Ideal for: developers, property managers, multi-unit commercial buildings
All pricing is indicative. Final cost is line-itemised in your contract before any work begins. Clause 7.2 penalty applies to all packages.
Calculate Your Project CostEvery enquiry gets a real response within 2 hours on business days — from a project manager, not an automated reply.
We respond within 2 business hours. Site survey booked within 48 hours of first contact.
A look at projects we've recently completed.







